GOVERNMENT HOSPITAL (50 BEDDED) BAGALKOT.
DETAILS OF PROJECT
Construction of Hospital Building. Including electrical, plumbing, lift facility and fire safety precautions
Construction of Hospital Building. Including electrical, plumbing, lift facility and fire safety precautions
Construction of student’s hostel
Construction of Building including steel structural works and covering with GI sheets
Construction of Auditorium Building along with other allied works and sitting arrangements and statutory works
Construction of building with structural work and finishing works.
Construction of Hostel Building and allied works
Construction of Auditorium Building along with other aid works and sitting arrangements
Construction of Building and other aid works. Development of landscape
Four Laning of Ausa - Chakur Section of NH-361 from Km 95.000 to 114.345 under Bharatmala Pariyojna in the State of Maharashtra (NHAI)
Constructions of single lane patrolling road, Double lane roads and 4 lane roads along with drains, CD’s, culverts, LVUP. Laying of Kerb stones in STPP NTPC Kudgi.
Constructions of Outer ring Road along with Bus Bays, median, drains and CD’s at Bijapur.
Construction of By-pass Road at Bagalkot.
Widening of Talikoti-Tumbagi Road under MDR improvement program.
Constructions of Double lane Road, Drains, CD’s and laying of paver blocks and kerb stones, kolhar town.
4 laning of connecting road from Bijapur-Bangalore highway(NH-52) to NTPC Kudgi township
4 laning of township to plant area at NTPC Kudgi. Which includes construction of drains, CD’s and one vehicle underpass(VUP) along with construction of median.
Constructions of double lane Asphalt Road
Planning of layout and Construction of 623 HOUSE’s including internal CC roads, Drains and CD works in rehabilitation center
Planning of layout and Construction of 500 residential building including internal Asphalt roads, Drains, CD works and STP
Construction of Intake Channel, Jack well, Foot bridge, laying of raw water rising main, water treatment plant ( Aerator, Flash mixer, Clari-flocculator, Rapid sand filter , back wash unit)Laying of Pure water rising and gravity main, Master Balancing reservoir etc. Construction of connecting double lane road to MDR’s
Construction and laying of raw water rising main, water treatment plant ( Aerator, Flash mixer, Clari-flocculator, slow sand filter, back wash unit)Laying of Pure water rising and gravity main, Master Balancing reservoir etc.
Construction of intake well and channel, laying of raw water rising main, water treatment plant. Laying of Pure water rising and gravity main, Master Balancing reservoir etc.
Construction of Intake Channel, Jack well, Foot bridge, laying of raw water rising main, water treatment plant ( Aerator, Flash mixer, Clari- flocculator, Rapid sand filter , back wash unit)Laying of Pure water rising and gravity main, Master Balancing reservoir etc. Construction of connecting double lane road to MDR’s
Construction of jack well, Foot bridge, laying of raw water rising main, water treatment plant, Laying of Pure water rising and gravity main, Master Balancing reservoir etc.
Construction of water treatment plant, Laying of Pure water rising and gravity main, GLSR etc
Connect us any time for quick result